Edit Rate Build-Up
  • Each cost plan item in the Cost Plan library is already linked to Bill items comprising that Cost plan item with a formula linked to each Bill item whose variables can be set to reflect the current requirement (e.g. length, height, depth, etc.)
  • Edit Cost plan item description to suit your project (such changes do not affect the library)
  • Edit Variables in the formulae
  • Assign package to each rate buildup item. Packages outside the Principal Contract will produce Provisional Sums when the Bills of Quantities are generated from the Cost Plan.
  • Edit Rate for each line item from a central rate file
  • Enter plug-in rate to override the built up rate