Onscreen take-off of dims with DimensionX is fully integrated into QSplus
Fast and easy conversion of Cost Estimates and Elemental Cost Plans to Bills of Quantities
Elemental Rate Benchmarking provides graphic comparison of the Elemental Rates for the current project, to the relevant
building type benchmark
Regional libraries of Cost Plan rates may be maintained
The ASAQS Guide to Elemental Cost Estimating is included as a Help File on the system
Contract Particulars
Entry of general project data such as project description, client, consultants (selected from central database),
cost plan dates, program dates, VAT % and price increase forecast data for auto calculation of escalations from
Cost Plan date to project completion
Setting of percentages or amounts for auto calculation of professional fees
Setting of percentages or amounts for auto calculation of Preliminaries and Contingencies (Prelims can be measured if
preferred)
Describing additional provisions outside the cost plan
Sections and Locations
Setup of Cost Plan sections for multi-use building cost plans and locations within each building to further break
down the detail, if required. Locations carry a factor which can be amended
Consultant's drawings can be registered in Contract Particulars
Professional fees can be set up differently for each section
Preliminaries and Contingency percentages or amounts can be set up differently for each section for auto calculation
Program dates defaulted from Contract particulars can be amended to suit phased construction of the various buildings
Construction, Site and Rentable Areas
Upfront entry of measurements which can be used later for the measurement of cost plan items
Included on output documents for information and calculation of efficiency ratios
Measurement
Items are selected from the library of items, edited as required and saved in the correct position on the
Measure by Element window. Dimensions are entered as listed under
Take-off functions
Edit Rate Build-Up
Each cost plan item in the Cost Plan library is already linked to Bill items comprising that Cost
plan item with a formula linked to each Bill item whose variables can be set to reflect the current
requirement (e.g. length, height, depth, etc.)
Edit Cost plan item description to suit your project (such changes do not affect the library)
Edit Variables in the formulae
Assign package to each rate buildup item. Packages outside the Principal Contract will produce Provisional Sums when the Bills of
Quantities are generated from the Cost Plan.
Edit Rate for each line item from a central rate file
Enter plug-in rate to override the built up rate
Printouts
Dimension Detail
Dimension Summary
Cost Plan Abstract
Package Split
Locational Summaries
Data Import
Import items from previous projects, with or without dimensions
Print Cost Plan
Print the Cost Plan at various levels, viz.
Project
Section (building)
Executive Summary/Elemental Analysis
Item Detail including or excluding the detail of the rate buildup items
Output Executive Summary/Elemental Analysis and Item Detail to Excel
Generate Tender Documentation
Using the Rate Buildup items associated with each Cost Plan item, this process extrapolates them into Bill data using the
quantity measured against each Cost Plan item. Trades, Bill headings, subheadings and items are automatically generated
The Principal Contract Tender document will automatically include items in the Provisional Sums trade with the correct description
and money value for all other packages measured in the Cost Plan
Bill items cross reference to Cost Plan in full detail